LinkedIn
Facebook
X
Email

SEDERHANA EVALUATION; IRS INCREASED PRODUCTION THROUGH BETTER WATER MANAGEMENT

Publication Year: 1977
Document ID: PD-AAR-734
Contract Number: N/A
Downloaded: N/A
[pdf_download]
Publication Year: 1977
Document ID: PD-AAR-734
Contract Number: N/A

Share this document:

EVALUATES PERFORMANCE OF THE SEDERHANA (SIMPLE) IRRIGATION AND RECLAMATION PROGRAM (IRS) IN INDONESIA FROM 6/75 TO 6/78. THE IRS PROGRAM INCLUDES HUNDREDS OF SMALL-SCALE IRRIGATION/RECLAMATION SUBPROJECTS SCATTERED THROUGHOUT INDONESIA DESIGNED FOR QUICK INCREASES IN RICE PRODUCTION. THE 3-MAN EVALUATION TEAM VISITED 60 SUBPROJECTS, INTERVIEWED FARMERS AND IOCAL OFFICIALS, HELD DISCUSSIONS WITH GOI AND USAID OFFICIALS, AND UTILIZED PROFRAM DOCUMENTATION. THE EVALUATORS CONCLUDE THAT IRS IS PROVING TO BE A WORTHWHILE AND EFFECTIVE PROGRAM FOR PROMOTING RICE PRODUCTION. BY LATE 1977, IRS HAD EXPANDED IRRIGATED RICE HECTARAGE BY 18,000 HA. IRS HAD ALSO ENHANCED INCOME FOR SEVERAL HUNDRED THOUSAND SMALL FARM FAMILIES. THE COST-BENEFIT ANALYSIS SECTION OF THE REPORT CONCLUDES THAT IRS IS ON ITS WAY TOWARDS COVERING THE SOCIAL OPPORTUNITY COSTS OF BOTH CAPITAL AND LABOR. PROGRESS TOWARDS STRENGHTENING GOI AND VILLAGE INSTITUTIONS RESPONSIBLE FOR IMPLEMENTING IRS, WHILE READILY OBSERVABLE, APPEARS TO HAVE BEEN SLOWER THAN PROJECTED. HENCE, TARGET HECTARAGE FOR THE GOI 1977/78 FISCAL YEAR WAS REDUCED TO 21,000 HA, DOWN FROM 49,000 HA DURING 1976/77. IRS OFFICIALS HAVE, HOWEVER, ACCUMULATED MUCH BENEFICIAL EXPERIENCE. EVALUATORS FEIT THAT FAR TOO SMALL A PORTION OF THE US TECHNICAL ASSISTANCE HAS BEEN DEVOTED TO STRENGTHENING THE IRS TRAINING INSTITUTIONS.IMPROVED TRAINING FOR IRS AFTER SHOULD BE FIRST PRIORITY FOR EXPANDED TECHNICAL ASSISTANCE. GOI HAS NOT YET INSTITUTIONALIZED OPERATION AND MAINTENANCE (O&M). NEVERTHELESS, THE LACK OF O&M BY THE IRRIGATION SERVICE HAS PROVIDED INCENTIVE FOR LOCAL COMMUNITY INITIATIVES. O&M OF MAJOR WORKS BEYOND THE CONTROL OF THE FARMERS SHOULD BE INSTITUTIONALIZED BY GOI. EVALUATORS RECOMMEND THAT DESIGN CONTRACTORS BE REQUIRED TO RETURN TO THE FIELD WITH THEIR PRELIMINARY LAYOUTS TO GET FEEDBACK FROM LOCAL ENGINEERS. THIS WOULD IMPROVE THE FUNCTIONALITY OF THE FINAL DESIGNS AND SSVE CONSIDERABLE GOI STAFF TIME NOW DEVOTED TO CORRECTING CONTRACTOR MISTAKES. IT IS ALSO DEEMED IMPERATIVE THAT ENGINEERS ACQUIRE A WORKING KNOWLEDGE OF INDONESIAN BEFORE ARRIVING.

Authors
GEMBALA, HENRY##DUEWEL, JOHN##GRAY, CLIVE
Authoring Organizations

Take action with I4DI’s DECipher—our advanced platform transcends basic data processing by actively learning, synthesizing, and leveraging decades of development expertise.

Completely free of charge

Type of Submission
Title / Summary *
Provide a short and clear title that summarizes the issue.
Description *
Describe the bug in detail. Please include what you expected to happen and what actually happened.
Relevant Link (optional)
Add a direct link to the page or screen where the bug occurred, if available. This helps us quickly locate and investigate the issue.
Consent & Submission Agreement *
I consent to being contacted by the I4DI team should additional information be required to better understand the issue I have reported.
Title / Summary *
Provide a short and clear title that summarizes the idea.
Description *
Describe the idea in detail.
Consent & Submission Agreement *
I consent to being contacted by the I4DI team should additional information be required to better understand the feature suggestion I have submitted.
Add Missing Document