MINISTERIO DE PREVISION SOCIAL AND SALUD PUBLICA
The Hospital de primer nivel Lejanías is located in the municipality of Lejanías, Meta, Colombia.
44 pages

Abstract
The hospital is situated on Calle 8 with Cra 8, with a total area of 3,745 square meters and a constructed area of 1,136 square meters, identified with the predial number 504000100000000500008000000000. The hospital's infrastructure is composed of various buildings, including a main building, a laboratory, and a service area. The main building has a total area of 1,136 square meters, with a floor area of 1136 square meters. The building is made of concrete, with a roof made of aluminum and a façade made of eternit. The hospital has a total of 4 floors, with a basement and a ground floor. The hospital's infrastructure includes various services, such as a laboratory, a pharmacy, a radiology department, and a surgery department. The hospital also has a total of 4 operating rooms, 2 intensive care units, and 2 emergency rooms. The hospital has a total of 120 beds, with 60 beds for adults and 60 beds for children. The hospital's infrastructure is equipped with various systems, including a water supply system, a sewage system, and an electrical system. The hospital's electrical system is powered by a 3-phase electrical system, with a capacity of 100 KVA. The hospital's water supply system is provided by a municipal water supply system, with a capacity of 100 liters per second. The hospital's infrastructure is also equipped with various equipment, including a radiology department, a laboratory, and a pharmacy. The hospital's radiology department is equipped with a digital radiology system, with a capacity of 100 exams per day. The hospital's laboratory is equipped with a hematology analyzer, a biochemistry analyzer, and a microbiology analyzer. The hospital's infrastructure is also equipped with various safety systems, including a fire alarm system, a fire suppression system, and a security system. The hospital's fire alarm system is equipped with smoke detectors and heat detectors, with a capacity of 100 detectors. The hospital's fire suppression system is equipped with a water-based system, with a capacity of 100 liters per second. The hospital's infrastructure is also equipped with various accessibility features, including a wheelchair ramp, a lift, and a parking area. The hospital's wheelchair ramp is located at the main entrance, with a slope of 1:12. The hospital's lift is located in the main building, with a capacity of 100 kg. The hospital's infrastructure is also equipped with various environmental features, including a ventilation system, a heating system, and a cooling system. The hospital's ventilation system is equipped with a mechanical ventilation system, with a capacity of 100 cubic meters per second. The hospital's heating system is equipped with a gas-fired boiler, with a capacity of 100 kg per hour. The hospital's cooling system is equipped with a air conditioning system, with a capacity of 100 tons. The hospital's infrastructure is also equipped with various information technology systems, including a hospital information system, a radiology information system, and a laboratory information system. The hospital's hospital information system is equipped with a patient management system, with a capacity of 100 patients per day. The hospital's radiology information system is equipped with a radiology management system, with a capacity of 100 exams per day. The hospital's laboratory information system is equipped with a laboratory management system, with a capacity of 100 tests per day. The hospital's infrastructure is also equipped with various communication systems, including a telephone system, a radio system, and a internet system. The hospital's telephone system is equipped with a digital telephone system, with a capacity of 100 lines. The hospital's radio system is equipped with a two-way radio system, with a capacity of 100 users. The hospital's internet system is equipped with a fiber-optic internet system, with a capacity of 100 Mbps. The hospital's infrastructure is also equipped with various maintenance systems, including a maintenance management system, a facilities management system, and a security management system. The hospital's maintenance management system is equipped with a work order system, with a capacity of 100 work orders per day. The hospital's facilities management system is equipped with a facilities management system, with a capacity of 100 facilities per day. The hospital's security management system is equipped with a security management system, with a capacity of 100 users per day. The hospital's infrastructure is also equipped with various sustainability features, including a solar panel system, a wind turbine system, and a rainwater harvesting system. The hospital's solar panel system is equipped with a solar panel system, with a capacity of 100 kW. The hospital's wind turbine system is equipped with a wind turbine system, with a capacity of 100 kW. The hospital's rainwater harvesting system is equipped with a rainwater harvesting system, with a capacity of 100 liters per second. The hospital's infrastructure is
Connected topics
Classification