JORDAN VALLEY IRRIGATION PROJECT, STAGE II, FEASIBILITY STUDY : VOLUME VI, PRELIMINARY DESIGN, APPENDIX J - STORAGE AND POWER FACILITIES, APPENDIX K - IRRIGATION FACILITIES, APPENDIX L - COST ESTIMATES
Sign inHARZA ENGINEERING CO.
APPENDIX J CONTAINS PRELIMINARY DESIGN OF STORAGE AND POWER FACILITIES.
SCOVILLE, JOHN A. · 1978
Abstract
APPENDIX K PROVIDES PRELIMINARY DESIGN OF IRRIGATION FACILITIES. APPENDIX L MAKES DETAILED COST ESTIMATE.
Connected topics
Classification
USAID DEC