USAID DEC
Customer Information Survey and Inspection Form (FORM-C-1, V-2.0) is used to gather information from customers and inspect the site for electricity supply.
5 pages

Abstract
The form is divided into several sections, including customer details, supply point inspection details, and site condition, among others. Customer details include existing billing information, customer information verification, and survey information for individual or business customers. The form requires the customer's name, account number, installation number, and other relevant details. For business customers, the form requires the organization's name, type, and registration number. The supply point inspection details section includes details about the feeder number, substation number, pole number, and meter type. The form also requires information about the meter's make, model, rating, and rating class. The meter reading and demand reading, as well as the CT and VT details, are also required. The site condition section assesses the safety and security of the metering equipment, wiring, and wiring condition, among other factors. The form requires the inspector to evaluate the site's safety for the meter readers, maintenance workers, and other personnel. The inspector must also specify if the site needs any work or refurbishment. The form also includes sections for the inspector to note any deviations from the customer's current design, list any signs of tamper or bypass, and specify the type of actual load and load estimate. The inspector must also evaluate the site's access, security, and security of the metering equipment. The form requires the inspector to take photos of the meter, test, and seals, wiring, CT/VTs, and site access and condition. The inspector must also specify the GPS coordinates of the metering point. The form is used to ensure that the site is safe and secure for the meter readers, maintenance workers, and other personnel. It also helps to identify any deviations from the customer's current design and any signs of tamper or bypass. The form is completed by the inspector and submitted to the work group. The form is reviewed, and the survey and inspection report is completed. The report is then sent to the manager for review and approval. The system data is updated, and the report is marked as complete. The form is completed by the inspector and submitted to the work group. The form is reviewed, and the
Classification