OPTIMUM UTILIZATION OF WATER FOR AGRICULTURE, WITH EMPHASIS ON ON - FARM WATER MANAGEMENT; ANNUAL TECHNICAL REPORT, 1974/1975
Sign inUTAH STATE UNIVERSITY. DEPT. OF AGRICULTURAL AND IRRIGATION ENGINEERING
1970

Abstract
No abstract is available for this document.
Connected topics
Classification

USAID DEC