USAID. MISSION TO INDONESIA
LOAN PROVIDED TO THE GOVERNMENT OF INDONESIA TO FINANCE FEASIBILITY STUDIES AND OTHER PRELIMINARY TECHNICAL ACTIVITES TO DEVELOP PROJECTS FOR FINANCING BY USAID, GOI, INTERNATIONAL DONOR AGENCIES, AND OTHER COUNTRIES.
CURRAN, T. W.; ROSE, ROBERT · 1971
Abstract
ACTIVITIES WILL BE IN THE GENERAL FIELDS OF INDUSTRY; ENERGY RESOURCES; GEOTHERMAL EXPLORATION, DRILLING AND TESTING; COMMUNICATIONS; TRANSPORTATION, INCLUDING ROADS, RAILWAYS, PORTS, AND CIVIL AIRFIELDS; WATER AND LAND RESOURCE DEVELOPMENT; WATER AND SEWERAGE FACILITIES; FISHING; AGRICULTURE; HOUSING; URBAN DEVELOPMENT; EDUCATION; HEALTH; AND TOURISM. SPECIFIC EXAMPLES OF PROJECT DEVELOPMENT ACTIVITIES INCLUDE: RICE PROCESSING AND STORAGE (FINAL FEASIBILITY, SITE INVESTIGATION, AND PRELIMINARYENGINEERING); WATER RESOURCES DEVELOPMENT IN TELUK LADA, TJITANDUJ; AND THE LOWER AND MIDDLE REACHES OF THE SOLO RIVER (FINAL FEASIBILITY STUDY); REHABILITATION AND MODERNIZATION OF THE TIN DREDGE "SUMATRA" (STUDY, DESIGN, AND PREPARATION OF PROCUREMENT DOCUMENTS); INDUSTRIAL ESTATES AT DJAKARTA, SURABAJA, AND TJILATJAP (FEASIBILITY STUDY AND SITE INVESTIGATION FOR ONE SELECTED AREA); WEST SUMATRA ELECTRIC POWER SYSTEM (FEASIBILITY STUDY); WEST KALIMANTAN POWER SYSTEM (FEASIBILITY STUDY); REHABILITATION OF 24, 1600-HP GENERAL ELECTRIC LOCOMOTIVES (STUDY, LOAN PAPER ASSISTANCE, PREPARATION OF BIDDING AND PROCUREMENT DOCUMENTS); REHABILITATION OF PORTS (PREFEASIBILITY STUDY, SURVEY, OPERATIONAL MANAGEMENT RECOMMENDATIONS FOR ONE OR TWO SELECTED PORTS); TRANS-JAVA HIGHWAY (FINAL DESIGN ENGINEERING); BANDUNG WATER SUPPLY (MASTER PLAN FOR DEVELOPMENT, FEASIBILITY STUDY FOR INITIAL INCREMENT); DIENG PLATEAU GEOTHERMAL DEVELOPMENT (EXPLORATORY DRILLING PHASE). US OR LOWER INCOME COUNTRY PRIVATE CONSULTING FIRMS WILL CONDUCT STUDIES. GOI WILL PROVIDE ALL LOCAL CURRENCY COSTS AND THE NATIONAL DEVELOPMENT PLANNING BOARD (BAPPENAS) WILL IMPLEMENT LOAN.
Classification