USAID. MISSION TO EGYPT
Project to improve the reliability and economy of operation of the Aswan High Dam Hydroelectric Power Station in Egypt.
1982
Abstract
The project consists primarily of replacing 12 Francis runners; 14 500 KV and 10 132 KV circuit breakers; a generator and generator/transformer; a 500 KV bus; a 132 KV bus differential relays; and control instruments.