US-Israel CDR program : a semi annual progress report (Jan-June, 1989) -- improving rain penetration and reducing soil erosion in dryland farming
Sign inAGRICULTURAL RESEARCH ORGANIZATION. THE VOLCANI CENTER. INSTITUTE OF SOILS AND WATER
Shainberg, I.; Ferreira, A. C. · 1970

Abstract
No abstract is available for this document.
Connected topics
Classification