USAID. MISSION TO INDONESIA
LOAN PROVIDED TO THE GOVERNMENT OF INDONESIA FOR THE PROCUREMENT AND INSTALLATION OF 40 MW OF INTERIM ELECTRICAL GENERATING CAPACITY AT JAKARTA TO MEET AN ANTICIPATED POWER SHORTAGE DURING THE 1974 DRY SEASON.
1973
Abstract
ALTHOUGH THIS PROJECT IS DESIGNED TO MEET AN INTERIM REQUIREMENT, IT IS AN IMPORTANT COMPONENT IN THE LONG RANGE ELECTRIC POWER PROGRAM FOR WEST JAVA. LOAN WILL FINANCE PURCHASE OF IMPORTED EQUIPMENT (TWO 20 MW, 50-CYLE GAS TURBINE GENERATORS, FUEL TREATMENT SYSTEM, SUBSTATION/SWITCH STATION, SPARE PARTS, TEST EQUIPMENT, AND COMMUNICATION EQUIPMENT), PRECONSTRUCTION ENGINEERING SERVICES, INSTALLATION SUPERVISION, AND US TRAINING FOR PERSONNEL OF THE STATE ELECTRICITY AUTHORITY (PLN). GOI WILL FINANCE THE LOCAL CURRENCY COSTS INCLUDING INSTALLATION LABOR, MATERIALS, AND FUEL STORAGE. CAP 10-5-73 PROVIDES FOR AN ADDITIONAL 2 GENERATING UNITS- RAISING CAPACITY BY 52 MW TO INSURE FIRM POWER DURING THE END OF THE 1974 DRY SEASON AND TO CONTRIBUTE TOWARD MEETING THE PROJECTED PEAK LOAD DEMAND IN 1975 AND BEYOND.
Connected topics
Classification