ADVANCED ENGINEERING ASSOCIATES INTERNATIONAL, INC. /SGGA
The Bosnian and Herzegovina Regulatory and Energy Project (REAP) aims to improve the energy sector in the country.
2014 · 1 pages

Abstract
The project is implemented by Advanced Engineering Associates International, Inc. under a USAID contract. The project focuses on enhancing the regulatory framework and operational framework of the energy sector. Key activities include the development of common standards for the transmission and distribution of electricity, as well as the implementation of a secondary capacity market. The project also involves the establishment of an auction system for the allocation of transmission capacity. The auction system is designed to ensure a fair and transparent allocation of capacity among participants. The project includes several definitions and guidelines for the auction process. These definitions cover the advance payment invoice, Transco charges for annual and monthly capacity, and the basis of the auction, which is measured in megawatts. The project also outlines the procedures for the conduct of users, the firmness of capacity, and the notification of auction results. The project specifies that the auction administrator will be administered by the Independent System Operator (ISO), which will also publish the auction results. The project outlines the procedures for the designation of use of revenues, the calculation of net transfer, and the types of auctions that will be conducted. The project also includes provisions for participant requirements, breach of rules, and the change of timing and procedure of the auction. The project aims to improve the efficiency and transparency of the energy sector in Bosnia and Herzegovina. The project is sponsored by the American People through the United States Agency for International Development (USAID). The contents of the project are the sole responsibility of the author and do not necessarily reflect the views of USAID or the United States Government. The project includes several provisions for the administration of the auction, including the submission of invoices and the issuance of notifications. The project also outlines the procedures for the designation of use of revenues and the calculation of net transfer. The project aims to ensure a fair and transparent allocation of transmission capacity among participants. The project includes several provisions for the participant requirements, breach of rules, and the change of timing and procedure of the auction. The project also outlines the procedures for the administration of the auction, including the submission of invoices and the issuance of notifications. The project aims to improve the efficiency and transparency of the energy sector in Bosnia and Herzegovina.
Connected topics
Classification
USAID DEC