Welded wire wall and embankment system with cohesive backfill on soft clay : fourth progress report for the period ending January 31, 1990
Sign inASIAN INSTITUTE OF TECHNOLOGY. DIV. OF GEOTECHNICAL AND TRANSPORTATION ENGINEERING
Bergado, Dennes T.; Sampaco, Casan L. · 1990

Abstract
No abstract is available for this document.
Connected topics
Classification
USAID DEC