Welded wire wall and embankment system with poor quality backfill on soft clay
ASIAN INSTITUTE OF TECHNOLOGY. DIV. OF GEOTECHNICAL AND TRANSPORTATION ENGINEERING
Bergado, Dennes; Balasubramaniam, A. S. +1 more · 1992
Abstract
No abstract is available for this document.
Connected topics
Related documents
USAID DEC
Classification