TETRA TECH
The Bill of Quantities for Works at Sardar Girl's High School, prepared by Tetra Tech, outlines the scope of work and estimated costs for various construction activities.
8 pages

Abstract
The document is divided into six sections, each corresponding to a specific category of work. Preliminary and General work, as outlined in Bill No. 1, includes contractor mobilization and demobilization, site demolition, and site clearing and grading. The estimated cost for these activities is $0. Miscellaneous Cast-in-Place Concrete work, as outlined in Bill No. 2, includes the construction of sidewalks, driveways, and reinforced concrete pads. The estimated cost for these activities is also $0. Greywater Tanks, Sewer, and Greywater Drain Piping work, as outlined in Bill No. 3, includes the construction of sanitary influent pump stations, WWTPs, and greywater storage tanks. The estimated cost for these activities is $0. Water Piping, Wells, and Water Storage Tank work, as outlined in Bill No. 4, includes the construction of a potable water tank, water piping, and well construction. The estimated cost for these activities is also $0. Power Supply work, as outlined in Bill No. 5, includes the installation of electrical duct banks, electrical conduit and wiring, and manual transfer switches. The estimated cost for these activities is $0. Miscellaneous Site Items, as outlined in Bill No. 6, includes the installation of chain link security fences, parking space pavement markings, and bicycle racks. The estimated cost for these activities is also $0. The total estimated cost for all the activities outlined in the Bill of Quantities is $0.
Connected topics
Classification
USAID DEC