Site Layout, Grading, and Utilities Contract Addendum 1 for Sardar Girl's High School
Sign inTETRA TECH
The Sardar Girl's High School Site Layout, Grading, and Utilities Contract Addendum 1 outlines the scope of work for various site development and infrastructure projects.
2011 · 7 pages

Abstract
The contract is between Tetra Tech and the school administration, with the primary objective of upgrading the school's facilities and utilities. The preliminary and general work includes contractor mobilization and demobilization, site demolition, and site clearing and rough grading. The site clearing and rough grading work involves excavation, shoring, and dewatering, with a total quantity of 3504 cubic meters of material to be moved. The site drainage piping work includes the installation of 150 mm diameter corrugated HDPE pipes, with a total length of 68 meters to be installed. The miscellaneous cast-in-place concrete work includes the installation of reinforced concrete sidewalks, driveways, and curbs. The sidewalks are 150 mm deep and 1136 meters long, while the driveways are 150 mm deep and 1013 meters long. The curbs are 150 x 150 mm in size and 593 meters long. The concrete work also includes the installation of a reinforced concrete pad for a transformer, a reinforced concrete spill pad for a water tank, and ceramic pavers for the assembly area. The sanitary treatment systems and drain piping work includes the installation of 80 mm and 110 mm diameter SDR 17 HDPE sewer connections, with a total quantity of 71 meters to be installed. The work also includes the installation of reinforced concrete sewer manholes, with a total quantity of 9 manholes to be installed. The leach field work includes the installation of distribution boxes, pipes, fittings, geotextile fabric, and infiltration base, with a total quantity of 1 unit to be installed. The water piping, wells, and water storage tank work includes the installation of a 65 m3 potable water tank, water piping to serve the water tank, well construction, well pump and controls, and well pump security enclosure. The work also includes the installation of a chlorine disinfection system, with a total quantity of 1 unit to be installed. The water service connections work includes the installation of gate valves, valve boxes, and connecting to existing stub-outs, with a total quantity of 9 connections to be installed. The contract specifies that all work shall be completed in accordance with the drawings and specifications provided. The contract also includes provisions for quality control, safety, and environmental protection. The total quantity of work to be completed is $0, indicating that the contract is for a zero-cost project.
Connected topics
Classification