Bill of Quantity (BoQ, Conceptual Design) for Chimtala to Maydan Shahr S3V1 Electrification
Sign inUSAID DEC
The Chimtala to Maydan Shahr S3V1 Electrification project involves the installation of a 20-kV overhead line (OHL) and secondary 400-V distribution systems.
48 pages

Abstract
The project requires the delivery of various materials, including aluminum conductor steel reinforced (ACSR) cables, compression splices, pre-stressed steel and concrete poles, and secondary transformers. The 20-kV OHL system consists of ACSR cables with different diameters, including 81.3-mm2, 109.7-mm2, 141.4-mm2, and 213.6-mm2. The system also includes compression splices, suspension and tension poles, and cross-arm assemblies. The poles are made of pre-stressed steel and concrete, with lengths ranging from 10 to 15 meters. The secondary 400-V distribution system includes air-bounded conductor (ABC) cables with different diameters, ranging from 50-mm2 to 120-mm2. The system also includes meter boxes, distribution panels, and circuit breakers. The meter boxes are pad-mounted or pole-mounted, and are equipped with fuses and main fuses. The project also requires the installation of service laterals and SE disconnects. The service laterals are made of copper NYY cables with different diameters, ranging from 6-mm2 to 10-mm2. The SE disconnects are metal-enclosed circuit breakers with different ratings, including 30-A, 1-P and 30-A, 3-P. The project involves the delivery of various materials, including cables, poles, transformers, and other equipment. The quantities of the materials are specified in the bill of quantity (BoQ), which includes 158 meters of 20-kV OHL cable, 330 meters of 400-V ABC cable, and 20 units of 30-A, 1-P SE disconnects. The project requires the use of various materials and equipment, including ACSR cables, compression splices, pre-stressed steel and concrete poles, secondary transformers, ABC cables, meter boxes, distribution panels, circuit breakers, copper NYY cables, and metal-enclosed circuit breakers. The project involves the installation of a 20-kV OHL system and a secondary 400-V distribution system, and requires the delivery of various materials and equipment. The project's geographic focus is on the Chimtala to Maydan Shahr area, and the project's timeframes are not specified in the provided information. However, the project's implementation details are outlined in the bill of quantity (BoQ), which includes the quantities of materials and equipment required for the project. The project's recommendations are not specified in the provided information. However, the project's implementation details and the quantities of materials and equipment required for the project suggest that the project is designed to provide reliable and efficient electrical power distribution to the Chimtala to Maydan Shahr area.
Connected topics
Classification
USAID DEC