The Sardarbeg Electrification project involves the installation of a 20-kV overhead line (OHL) system, secondary transformers, and 400-V distribution lines.
2011 · 32 pages

Abstract
The project requires the delivery of pre-stressed steel, concrete poles, overall length, and nominal force. The poles are categorized into different types, including 'H' Frame poles, suspension poles, and tension poles, with varying lengths and nominal forces. The 20-kV OHL system consists of aluminum conductor steel reinforced (ACSR) cables, with different types of ACSR cables specified for different sections of the line. The cables are categorized into different types, including C6a, C6, and C6b, with varying diameters and weights. The system also includes suspension and tension poles, cross-arm assemblies, and insulators. The secondary transformer section of the project involves the installation of oil-immersed distribution transformers with different capacities, including 25-kVA, 40-kVA, 63-kVA, 100-kVA, 160-kVA, 250-kVA, 400-kVA, 630-kVA, and 1,000-kVA. The transformers are categorized into different types, including Dyn5 50-Hz dual voltage 15-20/0.4-kV. The 400-V OHL to meter boxes section of the project involves the installation of air-bounded conductor (ABC) cables, with different types of ABC cables specified for different sections of the line. The cables are categorized into different types, including C9a, C9, and C9b, with varying diameters and weights. The system also includes meter boxes, including M-002 and M-003, with different types of wiring and accessories. The service laterals and SE disconnects section of the project involves the installation of service disconnects, including 30-A, 1-P metal enclosed circuit breakers, and 30-A, 3-P metal enclosed circuit breakers. The section also includes service laterals, including CU NYY 3x6-mm2 RE and CU NYY 3x10-mm2 RE. The project requires a total of 2520 meters of 20-kV OHL, including 2520 meters of C6a ACSR cable, 0 meters of C6 ACSR cable, and 0 meters of C6b ACSR cable. The project also requires a total of 13 units of pre-stressed steel, concrete poles, overall length, and nominal force, including 1 unit of 'H' Frame pole 10-m, 2,400-kgN, 1 unit of 'H' Frame pole 12-m, 2,400-kgN, and 11 units of suspension poles. The project also requires a total of 48 units of porcelain suspension insulators, 48 units of tension insulator clamps, 45 units of porcelain pin insulators, and 72 meters of guy wire, zinc coated steel, 7x3.65-mm2 (11.0-mmΦ). The project also requires a total of 6 units of guying cone anchor, concrete, 200-mm, from 150-mmΦ to 460-mmΦ, 6 units of guying anchor rod M20, x 2,400-mm w/nut, square washer, and 6 units of machine bolt, metric thread, hex head, M20, 250-mm, w/square washer, spring lock washer. The project also requires a total of 250 units of 30-A, 1-P kWH Siemens MPE revenue meter, 2 units of 30-A, 3-P kWH Tetlow revenue meter, and 57 units of LV-101 ABC suspension (tangent) hardware. The project also requires a total of 114 cubic meters of gravel, 228 cubic meters of masonry stone, and 17,100 kilograms of cement. The project also requires a total of 684 meters of guy wire, zinc coated steel, 7x2.00-mm (7.0-mmΦ), 57 units of guying cone anchor, concrete, 200-mm, from 150-mmΦ to 460-mmΦ, 57 units of guying anchor rod M16, x 2,000-mm w/nut, square washer, and 57 units of machine bolt, metric thread, hex head, M16, 200-mm, w/square washer, spring lock washer. The project also requires a total of 250 units of service disconnect, 30-A, 1-P metal enclosed circuit breaker, SqD, 250 units of electrode (copper rod 16-mmΦ, 1,800-mm long), 250 units of ground rod clamp, 16-mmΦ, 10-mm2, and 250 units of split-bolt grounding connector, 12-mmΦ, 10-mm2.
Connected topics
Classification