ADVANCED ENGINEERING ASSOCIATES INTERNATIONAL, INC. /SGGA
The Enterprise Energy Efficiency (3E) project in Bosnia and Herzegovina aims to implement 17 energy-efficient pilot projects throughout the country.
2014 · 33 pages

Abstract
The project's objectives include increasing public and private sector capacity to implement energy efficiency projects, raising public awareness of energy efficiency potential, and implementing energy-efficient measures in various sectors. The 17 approved pilot projects are located in different cities and municipalities across Bosnia and Herzegovina, including Sarajevo, Tuzla, Mostar, and Banja Luka. These projects involve various energy-efficient measures, such as the installation of new gas condensing boilers, window replacement, thermal insulation of facades, and the implementation of monitoring and verification systems. One of the pilot projects is the Mechanical Engineering Faculty in Sarajevo, which involved the implementation of energy-efficient measures valued at 561,500 KM. The project was implemented in partnership with UNDP BiH and the Mechanical Engineering Faculty, with USAID 3E providing 130,000 KM in funding. The project resulted in a 50% reduction in energy consumption, equivalent to 412 MWh per year, and a payback period of 10 years. Another pilot project is the Primary School "Pazar" in Tuzla, which involved the implementation of energy-efficient measures valued at 170,000 KM. The project was implemented in partnership with UNDP BiH and the Municipality of Tuzla, with USAID 3E providing 105,000 KM in funding. The project resulted in a 30% reduction in energy consumption, equivalent to 99 MWh per year, and a payback period of 23.6 years. The pilot project in Mostar, Old High School, involved the implementation of energy-efficient measures valued at 56,000 KM. The project was implemented in partnership with UNDP BiH and the City of Mostar, with USAID 3E providing 29,500 KM in funding. The project resulted in a 20% reduction in energy consumption, equivalent to 50 MWh per year, and a payback period of 5.7 years. The USAID 3E project aims to promote energy efficiency in various sectors, including education, healthcare, and government institutions. The project's success will contribute to reducing energy consumption and greenhouse gas emissions in Bosnia and Herzegovina, while also promoting economic growth and development.
Connected topics
Classification
USAID DEC