Monthly Progress Report -17-00003 - Al Badhan – Al Nassariya Road Project – Seg. B – January, 2018
Sign inUSAID
The Local Construction Program (LCP) is a USAID mission initiative focused on the rehabilitation and construction of roads, water, wastewater, and buildings construction projects in West Bank and Gaza.
2018 · 99 pages

Abstract
The program aims to improve Palestinians' access to basic infrastructure and services, thereby contributing to economic growth. The LCP's objective is to help the Palestinian economy by improving infrastructure and services. The Al Badhan – Al Nassariya Road Project, Segment B, is a key component of the LCP. The project involves the reconstruction of approximately 4.64 kilometers of a two-lane rural collector road in Nablus Governorate. The road starts near Tubas Intersection and ends at Al Nassariya Village. The project includes the construction of an 11.2-meter minimum width carriage way, concrete side ditches, concrete retaining walls and stonewalls, sidewalks, box culverts, crossing pipe culverts, and roadway furniture. The project's key map indicates the location of the road reconstruction, which spans from Station 3+750 to Station 8+386. Vantage photos taken on January 31, 2018, show the project site at Station 3+800, both from the forward and backward directions. The photos provide a visual representation of the project's progress. The project's progress report for January 2018 highlights several key activities. The report indicates that the project is on track, with all required permits and approvals in place. The project team has completed the necessary site preparation work, including clearing and grubbing, and has begun excavation and grading activities. The report also notes that the project has achieved a significant milestone, with the completion of the first phase of the road reconstruction. The project's safety plan and measures are in place, with regular safety meetings and inspections conducted to ensure compliance with Occupational Safety and Health Administration (OSHA) regulations. The project team has also implemented a Construction Risk Management Plan (CRMP) to mitigate potential risks and ensure the project's successful completion. The project's traffic control and management plan is also in place, with measures implemented to minimize disruptions to traffic flow during construction. The project team has also established a Gender Action Plan to ensure that the project's benefits are equitably distributed among all stakeholders, particularly women. The project's progress and scheduling are being closely monitored, with regular site visits and meetings conducted to ensure that the project is on track to meet its deadlines. The project team has also established a quality control program to ensure that the project's construction meets the required standards. The project's quality control status is being closely monitored, with regular inspections and testing conducted to ensure compliance with the project's quality control plan. The project team has also established a quality assurance program to ensure that the project's construction meets the required standards. The project's progress payment log indicates that payments have been made to the contractor for the work completed during the month of January 2018. The project's change order requests log indicates that no change orders have been requested during the month of January 2018. The project's safety status is being closely monitored, with regular safety meetings and inspections conducted to ensure compliance with OSHA regulations. The project team has also implemented a safety plan and measures to mitigate potential risks and ensure the project's successful completion. The project's environmental compliance is being closely monitored, with regular inspections and testing conducted to ensure compliance with environmental regulations. The project team has also established an environmental management plan to ensure that the project's construction does not harm the environment. The project's construction risk management plan is in place, with measures implemented to mitigate potential risks and ensure the project's successful completion. The project team has also established a risk management plan to identify and mitigate potential risks that may impact the project's success. The project's gender action plan is in place, with measures implemented to ensure that the project's benefits are equitably distributed among all stakeholders, particularly women. The project team has also established a gender action plan to ensure that the project's construction does not harm women or girls. The project's meetings and coordination activities log indicates that regular meetings have been conducted with stakeholders to ensure that the project's progress is on track. The project team has also established a coordination plan to ensure that all stakeholders are informed of the project's progress and any changes to the project schedule. The project's site visits log indicates that regular site visits have been conducted to ensure that the project's construction is on track. The project team has also established a site visit plan to ensure that all stakeholders are informed of the project's progress and any changes to the project schedule. The project's material and equipment log indicates that all required materials and equipment have been delivered to the project site. The project team has also established a material and equipment management plan to ensure that all materials and equipment are properly stored and maintained. The project's CPM schedule indicates that the project is on track to meet its deadlines. The project team has also established a scheduling plan to ensure that all tasks are completed on time and within budget. The project's GEO-MIS data collection sheets indicate that all required data has
Connected topics
Classification
USAID DEC