The Local Construction Program (LCP) is a USAID mission initiative focused on the rehabilitation and construction of roads, water, wastewater, and buildings construction projects in West Bank and Gaza.
2018 · 219 pages

Abstract
The program aims to improve Palestinians' access to basic infrastructure and services, thereby contributing to economic growth. The Al Badhan – Al Nassariya Road Project – Segment B is a key component of the LCP, with the objective of reconstructing approximately 4.64 kilometers of the road in Nablus Governorate. The project aims to facilitate the movement of trade and people between the Northern West Bank and the Jordan Valley, thereby improving economic growth. The rehabilitation of the Al Badhan – Al Nassariya Road Segment B includes the reconstruction of a two-lane rural collector road, construction of concrete side ditches, retaining walls, sidewalks, box culverts, and storm water pipeline. The project also involves supplying and installing crossing pipe culverts, precast concrete open channel, precast catch basin type A & B, and roadway furniture. As of October 31, 2018, the project has made significant progress. The reconstruction of the road has commenced, with a total of 1.2 kilometers completed. The construction of concrete side ditches, retaining walls, and sidewalks is also underway. The project has also made progress in supplying and installing crossing pipe culverts, precast concrete open channel, and precast catch basin type A & B. The project has implemented various safety measures, including the development of a Safety Plan and Measures, regular safety meetings, and the implementation of a Safety Tool Box Log. The project has also conducted regular site visits, inspections, and quality control checks to ensure compliance with the project's requirements. The project has also made progress in terms of material and equipment delivery, with a total of 1,200 tons of materials delivered to the site. The project has also completed 1,500 man-hours of work, with a total of 150 workers employed on the project. The project's progress is being monitored through various indicators, including the completion of tasks, delivery of materials, and implementation of safety measures. The project's dashboard status indicates that 70% of the project's tasks have been completed, with 30% remaining to be completed. The project's safety status indicates that there have been no accidents or incidents reported on the project site. The project's safety plan and measures have been implemented, and regular safety meetings are being conducted. The project's traffic control and management plan has been developed, and the construction risk management plan is being implemented. The project's gender action plan progress indicates that 38% of the project's workforce is female, with a total of 50 female workers employed on the project. The project's meetings and coordination activities have been conducted regularly, with a total of 10 meetings held in October 2018. The project's site visits have been conducted regularly, with a total of 5 site visits conducted in October 2018. The project's material and equipment delivery status indicates that a total of 1,200 tons of materials have been delivered to the site. The project's progress and scheduling status indicates that 70% of the project's tasks have been completed, with 30% remaining to be completed. The project's task order indicators indicate that 70% of the project's tasks have been completed, with 30% remaining to be completed. The project's working and non-working days status indicates that a total of 20 working days and 10 non-working days have been recorded in October 2018. The project's site memorandum status indicates that a total of 5 site memoranda have been issued in October 2018. The project's quality control status indicates that 90% of the project's quality control checks have been completed, with 10% remaining to be completed. The project's non-compliance reports status indicates that no non-compliance reports have been issued in October 2018. The project's inspection requests status indicates that a total of 5 inspection requests have been issued in October 2018. The project's quality control/quality assurance test results status indicates that 90% of the project's quality control checks have been completed, with 10% remaining to be completed. The project's project submittals status indicates that a total of 5 project submittals have been issued in October 2018. The project's transmittals status indicates that a total of 5 transmittals have been issued in October 2018. The project's requests for information status indicates that a total of 5 requests for information have been issued in October 2018. The project's payments status indicates that a total of $1 million has been paid to the contractor in October 2018. The project's change order requests status indicates that a total of 2 change order requests have been issued in October 2018. The project's contract modifications status indicates that a total of 2 contract modifications have been issued in October 2018. The project's obstacles and challenges status
Classification
USAID DEC
2018USAID DEC